Current research next steps¶
Last reviewed: 9 September 2026.
Current state¶
The classical benchmark repairs, frozen confirmation run, independent audit and manuscript
rebuild are complete and merged into main. Use the
audited confirmation guide for the current evidence, exact
revisions, workload counts, reproduction instructions and release status.
The library also contains estimand-triangle, discrimination, machine-learning and
observational workflows. Those are separate from the confirmation paper. The older
neural_classical_workstation exports and eight-record neural-like fixture do not provide
the rebuilt manuscript's evidence. The OpenNeuro pilot remains a separate observational
workflow demonstration, with no known H target or accuracy/coverage ground truth.
Next publication work¶
- Complete author review of the rebuilt manuscript and its claim-reconciliation ledger.
- Supply corresponding-author details, funding, competing interests and the target journal.
- Prepare deposition of the preserved raw results, frozen runtime and checksums. Assign an archive identifier only after the deposit exists; the software DOI is not a result DOI.
- Update the manuscript's availability statement to reflect the public GitHub sources and the eventual archive. The delivered 8 September draft predates the source merge.
- Apply journal formatting and recheck all tables, figures, equations and rendered pages.
Do not rerun or retune the confirmation merely to recover historical rankings. Extensions need a separately declared design, run identity and analysis, retaining the completed study.
Library maintenance¶
- Keep parameter defaults, input transformations, metric denominators and migration notes aligned with code changes. Follow the documentation maintenance checklist.
- Preserve historical outputs and frozen runtime snapshots; document which revision produced each result. Current source is not a replacement for the validated producer checkout.
- Keep release versions distinct from unreleased
main. Update citation and release guidance when a new package release or result archive is actually published. - Validate public output-contract changes separately from the research export format.
For normal development, install the documented extras into a development environment and run:
python -m ruff check src tests
python -m pytest
python -m mkdocs build --strict
These commands use the chosen development interpreter. They do not reproduce the production run, which requires the frozen environment described in the confirmation guide.
Future observational work¶
Use the observational readiness plan for that separate workstream. Require stable segment identifiers, sampling rate and preprocessing metadata, quality-control records, and a truth-free interpretation plan. Report validity, runtime, interval availability/width, estimator disagreement and sensitivity; do not present these as evidence of estimator accuracy, calibrated coverage or neural LRD detection.